Repton School-Derbyshire
Although small in size the project was logistically extremely difficult due to access and the length of the panels used. The solution involved the use of a 60m tower crane incorporating a vaccuum lifting device to enable the panels to be lifted into their specific location.
This enabled the whole roof to be completed in a single day and removed any issues with manual handling.
Although small in size the project was logistically extremely difficult due to access and the length of the panels used. The solution involved the use of a 60m tower crane incorporating a vaccuum lifting device to enable the panels to be lifted into their specific location.