Repton School-Derbyshire

Although small in size the project was logistically extremely difficult due to access and the length of the panels used.  The solution involved the use of a 60m tower crane incorporating a vaccuum lifting device to enable the panels to be lifted into their specific location.

This enabled the whole roof to be completed in a single day and removed any issues with manual handling.